November 2005

A look inside!

November 8th, 2005

The Reading Room

The Steven and Marjolaine Townsend Atrium

The staircase is in the center of the foyer. The Presidents' office will be located on the 2nd floor at the top of the landing.

The Steven and Marjolaine Townsend Atrium area of the new wing will be a spacious, light-filled entry way.  There will be window seating and table seating areas for students to congregate. The bookstore and The Spirol Corporation Art Gallery will be housed in this area.

  Construction image.  Construction image.

Left: This view is from the top of the landing looking down the "floating" hallway, which serves as a connector between the old and new wings.

Right: Down the main staircase

 

 

 

Construction image.                                           Construction image.

 

 

The Reading Room

Below is a view from inside & outside of the reading room. The Robert W. & Natalie M. Randall Reading Room houses a quiet area for students and staff.  The room houses a two-story window area which will bring natural light to the west end of the new wing. Currently, work is being done to prepare for the installation of the massive window.

 

Construction image.                                      Construction image.                

November 1, 2005

Construction image.    Construction image.

 

Check out additional construction and renovation progress!

   

| Building & Renovation Homepage | QVCC Homepage |

Rendering of the new addition.

last update: 11/16/2005 by: susan breault